Blog

Our Latest Blog Posts
27
Jan

Extending the weather window: Stress and fatigue elimination with ArticuLock®

Waiting on weather (WoW) can lead to significant and previously unavoidable downtime for operators. The introduction of DeltaTek’s stress and fatigue elimination technology, ArticuLock®, to the subsea market has opened up the weather window for the deployment of subsea architecture through the decoupling of the fixed MODU from the equipment being run. ArticuLock® eliminates stress through a ball and socket concept that allows for +/- 15 degrees of articulation whilst…

Read more →
09
Dec

Saved time, reduced risk – how SeaCure® mitigates over side standby cover / fast response cover

DeltaTek’s proprietary SeaCure® cementing system is commonly used due to its ability to provide Ultimate Cement Placement of the casing or liner string being installed. As well as Ultimate Cement Placement, many users have recognised multiple other inherent benefits of this technology, but the one which will be explored in this discussion is the capability to remove the requirement for overside work within the moonpool when running a casing string.…

Read more →
28
Oct

Downhole temperature data confirming ultimate cement placement

DeltaTek’s pioneering team is constantly striving to make technological improvements to provide our clients with greater value when deploying our systems. A recent improvement to our SeaCure® bottom hole assembly (BHA) involved offering DeltaTek’s weight set centraliser (WSC) as an alternative to our weight set sub (WSS). Both the WSC and WSS provide the set down weight required for the SeaCure® latch in adapter’s collet function to engage into the…

Read more →