Case Studies

North Sea (UK)

Chevron, West Wick – SeaCure

Chevron, West Wick – SeaCure

Cost efficiency and operational performance drive to eliminate a 26” clean out run of a 30”

Premier Oil, Solan – SeaCure

Premier Oil, Solan – SeaCure

Drilled 20” shoe out under-gauge without clean-out run, saving 12 hours.

Siccar Point, Blackrock – SeaCure and CoreCure

Siccar Point, Blackrock – SeaCure and CoreCure

Conductor cement job execution success, delivering foundation for well.

Siccar Point, Lyon – SeaCure

Siccar Point, Lyon – SeaCure

The clinical execution SeaCure Cementing delivers low-risk, high value cementing operations.

Total, Ballindalloch – SeaCure

Total, Ballindalloch – SeaCure

The clinical execution of SeaCure Cementing service delivers low-risk, high-value cementing operations and casing hydraulic integrity solutions.

Total, Glendronach – SeaCure and CoreCure

Total, Glendronach – SeaCure and CoreCure

Clinical execution SeaCure Cementing delivering low risk high value cementing operation and minimal fluid contamination.

Anon – Seacure, QuikCure and CoreCure

Anon – Seacure, QuikCure and CoreCure

6 well batch SeaCure with QuikCure hot water flush post successful cement placement to reduce Wait On Cement times.

Anon – SeaCure 20” Surface Casing

Anon – SeaCure 20” Surface Casing

Challenges with mudline hanger suspension wash port pressure testing over cemented shoetrack, and major risk exposure in float failure scenario for 30” x 20”

Ithaca Energy – 36” QuikCure/CoreCure & 13-3/8” SeaCure

Ithaca Energy – 36” QuikCure/CoreCure & 13-3/8” SeaCure

QuikCure to reduce conductor WOC and SeaCure to provide zero shoetrack solution

Anon – SeaCureRS 7” Liner & CureCatcher

Anon – SeaCureRS 7” Liner & CureCatcher

SeaCureRS Cementing with CureCatcher solution delivering Ultimate Cement Placement

Anon – SeaCureRS 7” x 4-1/2” Liner & CureCatcher

Anon – SeaCureRS 7” x 4-1/2” Liner & CureCatcher

SeaCureRS Cementing with CureCatcher solution delivering 1.2m shoetrack and slurry mechanical separation to shoe

Shell – SeaCure & CoreCure 20” Surface Casing

Shell – SeaCure & CoreCure 20” Surface Casing

Surface casing cement job executed with 1662 bbls of 12.5ppg lead slurry and 222 bbls of 16.0ppg tail slurry

Harbour Energy – 30” SeaCure/QuikCure/CoreCureConductor and 20” SeaCureSurface Casing

Harbour Energy – 30” SeaCure/QuikCure/CoreCureConductor and 20” SeaCureSurface Casing

SeaCure zero shoetrack solution enabling a simple and risk free 16”
drill ahead out of the 20” shoe alongside QuikCure significantly
reducing WOC time on the 30” conductor

Ithaca Energy, North Sea – SeaCure/QuikCure/CoreCure Conductor SeaCure Surface Casing

Ithaca Energy, North Sea – SeaCure/QuikCure/CoreCure Conductor SeaCure Surface Casing

SeaCure delivering a quality primary cement job with the added benefit of rapid cement hydration technology, QuikCure to reduce WOC on conductor to 4 hours. The zero shoetrack solution also allowed for a simple and reliable drill out.

Anon - SeaCure 20” Surface Casing

Anon - SeaCure 20” Surface Casing

SeaCure stabbed in inner string technology enabling a pre installation casing pressure test prior to running the casing, mitigating against the risk of a failed test after running and cementing the string.

North Sea (Norway)

Anonymous – ArticuLock

Anonymous – ArticuLock

ArticuLock was used to de-couple the fixed MODU from the hanging conductor, enabling moving the rig in up to 4.5m Hs.

Lundin – Barents Sea (Polmak) – SeaCure

Lundin – Barents Sea (Polmak) – SeaCure

Clinical execution SeaCure Cementing eliminates SSR plugs and shoetrack enabling slim drill ahead.

Lundin – Barents Sea (Bask) – SeaCure

Lundin – Barents Sea (Bask) – SeaCure

Clinical execution SeaCure Cementing delivering low risk high value cementing operation and minimal fluid contamination.

Equinor - ArticuLock

Equinor - ArticuLock

ArticuLock used to de-couple the fixed MODU from the suspended conductor, enabling safe dual drilling operations in extreme weather conditions.

Global

Energean, Karish (Israel) – SeaCure

Energean, Karish (Israel) – SeaCure

Clinical execution SeaCure Cementing delivering low risk high value cementing operation and casing hydraulic integrity solution.

Anonymous, South Africa – ArticuLock

Anonymous, South Africa – ArticuLock

ArticuLock used to de-couple the fixed MODU from the hanging conductors and surface strings, enabling dual operations.

Premier Oil and Schlumberger – QuikCure and SeaCure

Premier Oil and Schlumberger – QuikCure and SeaCure

Clinical execution SeaCure and Quik Cure cement jobs delivering a low risk high value cementing operation.

PETRONAS Mexico – SeaCure + QuikCure + CoreCure 22” Surface Casing

PETRONAS Mexico – SeaCure + QuikCure + CoreCure 22” Surface Casing

20” SeaCure / QuikCure / CoreCure

20” SeaCure / QuikCure / CoreCure

Improve drill out of 20” shoetrack to mitigate risk of bit/BHA damage whilst also
eliminating risk of CART seal leak and improving cement compressive strength
development